There are lots of other support jobs that take place during build. We need a cart to move the robot from the pits to the playing field. When the robot its in the pit, it sits on the cartup high enough to work on. The cart has to be redesigned each year due to the redesign of the robot. We are a lot taller in starting configuration this year, so we have to lower the cart stand. There also need to be space on the cart for tools, batteries and the control box.

Leo and Tom are prepping the base. They are setting the rail spacing and mounting the electronics deep inside the base. We have learned the hard way to bury the electronics deep inside the frame.

The mast will fun on the rail unit that you see in the picture. The mast will be all the way back for stability when lifting and all the way to the front to pick up the ball. At least that's the theory. The electronics will be mounted very low and protected by the mast assembly.
01/28/08 Week 4 Day 1 It's Alive!!!!!!!!!!
It's on the ground and running. WOW... What a feeling that is every year. It is amazing to watch the new students seeing their first robot running. It's ugly as sin, but is beautiful to watch. Now the electrical team has something to work with. They will be programming the controls and building a permanent board to go ion the finished robot. The mechanical team can concentrate on the mast and the gripper.
Copyright © thesixweeks.com.All rights reserved.
Site
Map / Email me: John
Boucher